Sl.NO | Name Of the Project | Owner | Customer | Scope Of Project | Award Year |
---|---|---|---|---|---|
1 | CS/CPC/3035 Strcutural Concrete Repair of valve chamber in PAI's north colling water station in Shuiba Indusrial Area | Kuwait National Petroleum Company | Kuwait National Petroleum Company | The refurbishment / repair of the valve chamber facilities in Pumping Plant C at Shuaiba Industrial Area | 2024 |
2 | CB/CPC/2197 Construction of Operator Field Centers COFCs) for the New CFP Units in MAB Refinery | Kuwait National Petroleum Company | Kuwait National Petroleum Company | Construction of Seven Buildings / Operator Shelters (Scope includes Civil , Structural , Architectural,Electrical ,Fire Alarm system ,HVAC , Mechanical works ,Telecommunication Fire Fighting) | 2023 |
3 | (KOC Contract No: 21057423,JPF-5) Jurassic Production Facility-5 (JPF-5) | Kuwait Oil Company | Jereh Oil & Gas Engineering Corporation | Civil works, Structural Steel Erection, Shelter Erection & Road Works. | 2023 |
4 | (KOC Contract No: 21057423,JPF-5) Jurassic Production Facility-5 (JPF-5) | Kuwait Oil Company | Jereh Oil & Gas Engineering Corporation | Cable Laying , Termination & glanding, Tubing, Trayworks, Instrument Installation & testing | 2023 |
5 | South Kuwait Excavation Transportation and Remediation (SKETR) -Zone 3 | Kuwait Oil Company | Enshaat Al-Sayer General Trading & Contracting Co.W.L.L | Supply & Construct New Landfill for a Capacity up to 1,000,000 M3 | 2023 |
6 | Installation of New Desalter Train at GC 09, GC 10, GC 19 & GC 21 | Kuwait Oil Company | National Petroleum Construction Company, UAE | Intumscenet Passive Fire Proofing system to the Mechanical Equipment structure, vessel saddles, Skirts & Miscellaneous structures | 2023 |
7 | Contract NO.: HO/CPC/4314 Construction of New Visitors Car Parking at KNPC Head Office | Kuwait National Petroleum Company | Kuwait National Petroleum Company | Construction of New Visitors Car Parking & Guard Houses ( Scope includes Civil , Structural , Road work, Asphalt , Landscape ,Electrical , Fire Fighting , Solar system , Fire Alarm System and Security system | 2023 |
8 | Contract No.22057733 Construction of Workshop Hangar for Road & Support Team | Kuwait Oil Company | Kuwait Oil Company | Construction of K-Span Shelter , New Substation , Car park , Asphalt Paving & Fencing ( Scope includes Civil , Structural , Architectural , Electrical , HVAC , Mechanical works , Telecommunication ,Fire Fighting & Passive Fire proofing ) | 2022 |
9 | Contract No. 22058288 Enhancement and Extension of Hangars in Main Warehouse and Warehouse Yard-2 | Kuwait Oil Company | Kuwait Oil Company | Construction of Extension hanger for material issuing , Construction of Extension hanger for Custody Items & replacement of Existing S/S A119 (Scope includes Civil , Structural , Architectural , Electrical , HVAC , Mechanical works , Telecommunication ,Fire Fighting & Passive Fire proofing ) | 2022 |
10 | KOC Contract No: 21057423- Jurassic Production Facility- 5 (JPF-5) | Kuwait Oil Company | Jereh Oil & Gas Engineering Corporation | Building , Civil Work for equipment & process facilities and Steel structure Installation Work | 2022 |
11 | Contract No. 17051820 : GC 32 -New Gathering Center for SEK | Kuwait Oil Company | Petrofac International Ltd | Civil Works in ISBL and OSBL Area | 2022 |
12 | Road & Repair Works for New Strategic Gas Export Pipeline | Kuwait Oil Company | Larsen & Toubro Limited | Road work | 2022 |
13 | KCC/ELV/JIP/10/17 : Kuwait Cancer Centre | Kuwait Cancer Center | Honeywell Kuwait K.S.C.C | Engineering, supply, install, fix, terminate, and assemble all the necessary raceways/ conduits, Trunkey for the Access Control & intercom, CCTV, security, Fire-Alarm, Public Address, AV (IP-TV}, Queue-management and Structured cabling systems and supply and installation of wire I cable and installation of field equipment | 2017 |
14 | KCC/BMS/JIP/06/18 : Kuwait Cancer Centre | Kuwait Cancer Center | Honeywell Kuwait K.S.C.C | Engineering, supply, install, fix, terminate, and assemble all the necessary raceways I conduits, Trunkey for the Building Automation System (BAS) & VAV | 2017 |
COMPLETED CIVIL PROJECT WORKS
Sl.NO | Name Of the Project | Owner | Customer | Scope Of Project | Year Completed |
---|---|---|---|---|---|
1 | Hazardous Waste Management Services in Drilling and Workover Operations for Kuwait Oil Company | Kuwait Oil Company | Veolia Kuwait | Construction of Norm Decontamination Yard | 2023 |
2 | New 48" Crude Transit Line from North Kuwait To CMM | Kuwait Oil Company | L&T Engineering Kuwait | Civil Work | 2022 |
3 | Land Development & Fencing Works for Kuwait Oil Company JPF - 4 Facilities | Kuwait Oil Company | Spetco International Petroleum Company | Land Development & Fencing Works | 2022 |
4 | New Strategic Gas Export Pipeline from NK To MAA Refinery | Kuwait Oil Company | L&T Engineering Kuwait | Civil Work for Right of Way (ROW) for New Strategic Gas Export Pipeline from NK To MAA Refinery | 2022 |
5 | New Strategic Gas Export Pipeline from NK To MAA Refinery | Kuwait Oil Company | L&T Engineering Kuwait | Construction of Burn Pit / Anchor Blocks and Refactory Works | 2022 |
6 | Lower Fars Heavy Oil Development Project Phase -I | Kuwait Oil Company | Petrofac International Co | Civil Constrcution Works | 2021 |
7 | Construction of Structural Tower | Petroleum Coke Industries Company | Petroleum Coke Industries Company | Construction of structrual tower | 2019 |
8 | New '48' Crude Transit Line from North Kuwait to CMM | Kuwait Oil Company | L&T Engineering Kuwait | Civil Constrcution Works | 2019 |
9 | Lower Fars Heavy Oil Development Project Phase -I | Kuwait Oil Company | AL Ghanim International | Civil Constrcution Works | 2018 |
10 | Modification of Ground Hopper Charging Structure | United Steel Industrial Co. | United Steel Industrial Co. | Civil , Steel Structure & associated MEP works | 2018 |
11 | Various Works Related to Melt Shop Re Vamping Works | United Steel Industrial Co. | United Steel Industrial Co. | Civil & Steel Structure works | 2018 |
12 | Engineering, Procurement & Construction of New Gathering Center - GC30, North Kuwait | Kuwait Oil Company | L&T Engineering Kuwait | Excavation & Asphalting Swale Works | 2018 |
13 | Removal of Existing Concrete/Asphalt | Kuwait Industries Gases Co. | Gulf Cryo | Construction of Asphalt Concrete | 2016 |
14 | Revamping of Melt Shop Shut Down Works | United Steel Industrial Co. | United Steel Industrial Co. | Civil Constrcution Works | 2016 |
15 | Clean Fuels Project (CFP) | Kuwait National Petroleum Company | Consolidated Contracting Co. | Civil Constrcution for anchor Bay Works | 2016 |
16 | Construction Of 11 KV Substations at Sabriya & Rawdhatain | Kuwait Oil Company | O&G Engineering Co W L.L. | Installation of Sand Line Brick | 2015 |
COMPLETED BUILDING PROJECT WORKS
Sl.NO | Name Of the Project | Owner | Customer | Scope Of Project | Year Completed |
---|---|---|---|---|---|
1 | Soil Remediation Project Sketr-3 | Kuwait Oil Company | Enshaat Al-Sayer General Trading & Contracting Co. W.L. L | Construction of Office Building | 2023 |
2 | Construction of Injection Flowline Works | Kuwait Oil Company | Mechanical Engineering & Contracting Co. W.L. L | Construction of Site Office Building | 2023 |
3 | Soil Remediation Project SKETR-3 | Kuwait Oil Company | Enshaat Al-Sayer General Trading & Contracting Co. W.L. L | Construction of Site Office Building | 2022 |
4 | Jurassic Production Facilities JPF-4 | Kuwait Oil Company | Spetco International Petroleum Company | Construction of Site Office Building | 2022 |
5 | Jurassic Production Facilities JPF -5 | Kuwait Oil Company | Jereh Oil & Gas Engineering Corporation | Construction of Site Office Building | 2022 |
6 | Jurassic Production Facility 5 at North Kuwait | Kuwait Oil Company | Jereh Oil & Gas Engineering Corporation | Construction of Camp Building | 2022 |
7 | Jurassic Production Facilities 4 Jpf-4 WIP | Kuwait Oil Company | Spetco International Petroleum Company | Construction of Office Building | 2021 |
8 | Construction of Site Office for KNPC at MAA | Kuwait National Petroleum Company | L&T Engineering Kuwait | Construction of Site Office Building | 2021 |
9 | Jurassic Production Facility Phase-I | Kuwait Oil Company | Spetco International Petroleum Company | Construction of Site Office Building | 2021 |
10 | Civil Maintenance of Kuwait Oil Company Vacant Houses Ahmadi Part – II | Kuwait Oil Company | Kuwait Oil Company | Civil Maintenance works | 2021 |
11 | TL5-CS Pipe line project - Kuwait | Kuwait Oil Company | L&T Engineering Kuwait | Construction of Building & Station Civil Works | 2020 |
12 | Lower Fars Heavy Oil Development Project Phase -I | Kuwait Oil Company | Petrofac International Co | Construction of Chlorination Building and Its associated civil works for CMEI Works | 2020 |
13 | New '48' Crude Transit Line from North Kuwait to CMM | Kuwait Oil Company | L&T Engineering Kuwait | Construction of Building & Valve Station | 2020 |
14 | Lower Fars Heavy Oil Development Project Phase -I | Kuwait Oil Company | AL Ghanim International | Substation (CPF) Building Civil Works | 2017 |
15 | RM-2 Construction of New Ware House for Rebar Storage | United Steel Industrial Co. | United Steel Industrial Co. | Construction of Building for Rolling Mill -II | 2017 |
16 | Construction of Ware House Building for Rolling Mill -I | United Steel Industrial Co. | United Steel Industrial Co. | Construction of Building for Rolling Mill -I | 2016 |
COMPLETED MECHANICAL PROJECT WORKS
Sl.NO | Name Of the Project | Owner | Customer | Scope Of Project | Year Completed |
---|---|---|---|---|---|
1 | Petroleum Coke Industries- Shutdown Maintenance | Petroleum Coke Industries Company | Petroleum Coke Industries Company | Mechanical works during Shutdown | 2024 & 2023 |
2 | PO#SPT_35636-1-Jurassic Production Facilities-(JPF-4) | Kuwait Oil Company | Spetco International Petroleum Company | Supply of Manpower for Pre Commissioning & Commissioning activities | 2023 |
3 | KNPC Contract CA/CPC/0425 - Procurement Construction, Installation, Testing and Pre- Commissioning of Alternate Auto Vent Floater for TK-34 - 407 (Propane LPG tank TK-34-414) (Butane LPT Tank) at MAA Refinery (Unit-34) | Kuwait National Petroleum Company | Gas& Oil Field Service Company (GOFSCO) | Mechanical, Electrical, Instrumentation & Associated Civil works | 2022 |
4 | Petroleum Coke Industries- Skilled Manpower Supply for Operation & Maintenance | Petroleum Coke Industries Company | Petroleum Coke Industries Company | Skilled Manpower Supply for mechnical works | 2022 |
5 | Turnaround works for Shuaiba Oxygen Plant @ Shuaiba Refinery Area | Shuaiba Oxygen | Shuaiba Oxygen | Mechanical works during Tar Shutdown | 2022 |
6 | New Strategic Gas Export Pipeline from North Kuwait to MAA | Kuwait Oil Company | L&T Engineering Kuwait | Piping Erection Works | 2021 |
7 | Fabrication of BOP Control Unit Skid | Apex Energy General Trading Co | Apex Energy General Trading Co W.L.L | Mechanical Fabrication, Painting & E & I | 2021 |
8 | Installation of New Desalter Train at GC-09, GC-10, GC-19 & GC-21 | NPCC/Kuwait Oil Company | Alkhorayef Company for Sale Maintenance & Repair of Oil Production Equipment W.L. L | Structral Steel Shelter Erection | 2021 |
9 | Petroleum Coke Industries -Periodical Maintenance works | Petroleum Coke Industries Company | Petroleum Coke Industries Company | Fabrication and Installation of Hanger Support, Painting & Damper Position in work | 2021 |
10 | Petroleum Coke Industries- Shutdown Works | Petroleum Coke Industries Company | Petroleum Coke Industries Company | Mechanical works during Shutdown | 2021 |
11 | TL5-CS Pipe line Projects | Kuwait Oil Company | L&T Engineering Kuwait | Casing pipe fit up and Welding Works | 2020 |
12 | Petroleum Coke Industries -Periodical Maintenance works | Petroleum Coke Industries Company | Petroleum Coke Industries Company | Dismantling of Kiln Coating Removal & Loose Coating Inside the Kiln | 2020 |
13 | TL5-Pipeline Project | Kuwait Oil Company | L&T Engineering Kuwait | Piping & Structure Erection | 2020 |
14 | Petroleum Coke Industries- Shutdown Maintenance | Petroleum Coke Industries Company | Petroleum Coke Industries Company | Mechanical works during Shutdown | 2017 & 2019 |
15 | Engineering, Procurement & Construction of New Gathering Center - GC30, North Kuwait | Kuwait Oil Company | L&T Engineering Kuwait | Fabrication & Installation of GI piping works | 2019 |
16 | Petroleum Coke Industries Company | Petroleum Coke Industries Company | Petroleum Coke Industries Company | Skilled Manpower Supply for Operation & Maintenance | 2018 |
17 | MGT- GC29 MEI in North Kuwait | Kuwait Oil Company | Petrofac International Co /Penta Global Engineering Company LLC | Erection of Steel Structure and Sheeting | 2018 |
18 | Engineering, Procurement & Construction of New Gathering Center - GC30, North Kuwait | Kuwait Oil Company | L&T Engineering Kuwait | Fabrication & Installation of Clean Agent System and Fire water network inside buildings | 2017 |
19 | Engineering, Procurement & Construction of New Gathering Center - GC30, North Kuwait | Kuwait Oil Company | L&T Engineering Kuwait | Fabrication & Installation of Clean Agent System and Fire water network around tanks | 2017 |
20 | Engineering, Procurement & Construction of New Gathering Center - GC30, North Kuwait | Kuwait Oil Company | L&T Engineering Kuwait | Fabrication & Installation of Fire Water Spray System around tanks. | 2017 |
COMPLETED E&I PROJECT WORKS
Sl.NO | Name Of the Project | Owner | Customer | Scope Of Project | Year Completed |
---|---|---|---|---|---|
1 | Jurassic Production Facilities (JPF-3) Upgrade Phase - 1 | Kuwait Oil Company | Spetco International Petroleum Company | Electrical, Instrumentation, Cathodic production & Heat tracing installation Works | 2022 |
2 | Jurassic Production Facilities (JPF-3) Upgrade Phase - 1 (Substation (SS-4) Building) | Kuwait Oil Company | Spetco International Petroleum Company | Electrical, Fire Alarm & Fire Suppression | 2022 |
3 | Jurassic Production Facilities (JPF-3) Upgrade Phase - 1 | Kuwait Oil Company | Spetco International Petroleum Company | Installation for Instrumentation works | 2021 |
4 | Installation of Generator, Switchgear for Gathering Centre-03 & Gathering Centre-06 | Kuwait Oil Company | Al Bahar Group | Electrical & Instrumentation Works | 2020 |
5 | TLS-CS - Pipe Line Project | Kuwait National Petroleum Company | L&T Engineering Kuwait | Electrical & Instrumentation Works | 2020 |
6 | New 48" Crude Transit Line from North Kuwait to CMM | Kuwait Oil Company | L&T Engineering Kuwait | Electrical & Instrumentation Installation Works | 2020 |
7 | Engineering, Procurement & Construction of New Gathering Center - GC31, North Kuwait | Kuwait Oil Company | Dodsal Engineering and Construction Pvt Ltd | E & I Cable Glanding & Termination Work | 2019 |
8 | Lower Fars Heavy Oil Development Phase -I | Kuwait Oil Company | Petrofac International Co | Electrical, Instrumentation and Telecommunication Installation Works | 2019 |
9 | Construction and Maintenance of The Public Buildings of the Service Axis of Sabal, Al-Ahmad Housing City | The Public Authority of Housing Welfare (PA WH) | 0 & G Engineering W.L. L | MICC Cable Installation Works | 2018 |
10 | Lower Fars Heavy Oil Development Project Phase 1 | Kuwait Oil Company | AL Ghanim International | Electrical & Instrumentation Works | 2018 |
11 | Engineering, Procurement & Construction of New Gathering Center - GC31, North Kuwait | Kuwait Oil Company | Dodsal Engineering and Construction Pvt Ltd | Cable Joining & Mics Cable Termination Works | 2018 |
12 | Engineering, Procurement & Construction of New Gathering Center - GC30, North Kuwait | Kuwait Oil Company | L&T Engineering Kuwait | Installation of Electrical Works | 2018 |
13 | Construction and Maintenance of The Public Buildings of The Service Axis of Sabal, Al-Ahmad Housing City | The Public Authority of Housing Welfare (PA WH) | 0 & G Engineering W.L. L | Installation of Electrical Works | 2016 |
14 | 11 KV 72 Mw Main Int Ake Substation at Sabriya-B | Kuwait Oil Company | O & G Engineering W.L. L | Electrical & Instrumentation Works | 2015 |
COMPLETED FIREPROOFING, PAINTING & INSULATION PROJECT WORKS
Sl.NO | Name Of the Project | Owner | Customer | Scope Of Project | Year Completed |
---|---|---|---|---|---|
1 | KIPIC Al Zour Refinery Projects | Kuwait National Petroleum Company | Saipem S.p.A | Passive Fireproofing by using light weight vermiculite cementitious spray system | 2022 |
2 | AL-Zour KLNG Import Project | Kuwait Integrated Petroleum Industries Company | Hyundai Engineering & Construction Co.,Ltd | Passive Fireproofing by using Epoxy intumescent coating system | 2020 |
3 | AL-Zour KLNG Import Project | Kuwait Integrated Petroleum Industries Company | Hyundai Engineering & Construction Co.,Ltd | Passive Fireproofing by using light weight vermiculite cementitious spray system | 2019 |
4 | KIPIC Al Zour Refinery Projects | Kuwait Integrated Petroleum Industries Company | Sinopec Fifth Construction Co | Insulation & Cladding Works | 2019 |
5 | Petroleum Coke Industries- Shutdown Maintenance | Petroleum Coke Industries Company | Petroleum Coke Industries Company | Insulation & Cladding work | 2019 |
6 | Al-Zour KLNG Import Project | Kuwait Integrated Petroleum Industries Company | Hyundai Engineering & Construction Co.,Ltd | Surface preparation & Painting works | 2019 |
7 | Engineering, Procurement & Construction of New Gathering Center - GC29, North Kuwait | Kuwait Oil Company | Petrofac International Co | Surface preparation & Painting works | 2018 |
8 | MGT (Manifold Group Trunk Line) System for GC's 29, 30 & 31 | Kuwait Oil Company | Petrofac International Co | Surface preparation & Painting works | 2018 |
9 | Engineering, Procurement & Construction of New Gathering Center Gathering Centre-24, North Kuwait | Kuwait Oil Company | SK Engineering & Construction Co. | Surface preparation & Painting for Pipe & Tank works | 2010 |
10 | Installation of Low Sulfur Fuel Oil , Fuel Gas and Gas pipelines from Mina Ahmadi to Sabriya and Doha Power Plants | Kuwait Oil Company | Hyundai Engineering & Construction Co. | Surface preparation & Painting works | 2008 |
10 | Repair of Storage Tanks TK 22-459 & TK 61-81 | Kuwait National Petroleoum Company | Hyundai Engineering & Construction Co. | Surface preparation & Painting works | 2006 |
COMPLETED REFRACTORY PROJECT WORKS
Sl.NO | Name Of the Project | Owner | Customer | Scope Of Project | Year Completed |
---|---|---|---|---|---|
1 | Petroleum Coke Industries- Shutdown Maintenance | Petroleum Coke Industries Company | Petroleum Coke Industries Company | Refractory Works | 2024, 2023,2021, 2019 & 2017 |
2 | Kuwait Cement Company - Plant Kiln Refractory Works | Kuwait Cement Company | Kuwait Cement Company | Refractory Works | 2024, 2023,2022, 2021,2020, 2019 & 2018 |
3 | Petroleum Coke Industries Company Shutdown Refractory Works | Petroleum Coke Industries Company | Petroleum Coke Industries Company | Demolition & Installation of Refractory Bricks | 2022 |
4 | Package E-14 for the new 5500 TPDKCC Line - II Expansion Project | Kuwait Cement Company | O & G Engineering W.L. L | Refractory Erection works | 2014,2013 & 2012 |
COMPLETED SCAFFOLDING PROJECT WORKS
Sl.NO | Name Of the Project | Owner | Customer | Scope Of Project | Year Completed |
---|---|---|---|---|---|
1 | Jurassic Production Facilities 5 (JPF5) | Kuwait Oil Company | Jereh Oil & Gas Engineering Corporation | Supply, Erection and Dismantling of Scaffolding Works | 2023 |
2 | Petroleum Coke Industries- Shutdown Maintenance | Petroleum Coke Industries Company | Petroleum Coke Industries Company | Supply, Erection and Dismantling of Scaffolding Works | 2022 |
3 | Kuwait Oil Company Feed Pipelines for New Refinery Project | Kuwait Oil Company | Penta Global Engineering | Supply, Erection and Dismantling of Scaffolding Works | 2020 |
4 | Kuwait Cement Company Plant | Kuwait Cement Company | Kuwait Cement Company | Supply, Erection and Dismantling of Scaffolding Works | 2019 |
5 | Kuwait Oil Company Feed Pipelines for New Refinery Project (NRP) | Kuwait Oil Company | Penta Global/Saipem/Kipic | Supply, Erection and Dismantling of Scaffolding Works | 2018 |
6 | Engineering, Procurement & Construction of New Gathering Center - GC29, North Kuwait | Kuwait Oil Company | Petrofac International Co | Supply, Erection and Dismantling of Scaffolding Works | 2018 |
7 | Construction of Jurassic Production Facilities-3 | Kuwait Oil Company | Mark Technologies Company W.L. L | Supply, Erection & Dismantling of Scaffolding Works | 2018 |
8 | Construction of Jurassic Production Facilities-3 | Kuwait Oil Company | Mark Technologies Company W.L. L | Supply, Erection & Dismantling of Scaffolding Works | 2017 |
9 | MGT-GC29 MEI Works in North Kuwait | Petrofac International Co | Penta Global Engineering | Supply, Erection & Dismantling of Scaffolding Works | 2017 |